Information Technology Project Managers
Plan, initiate, and manage information technology (IT) projects. Lead and guide the work of technical staff. Serve as liaison between business and technical aspects of projects. Plan project stages and assess business implications for each stage. Monitor progress to assure deadlines, standards, and cost targets are met.
Also known as: Application Manager · Cloud Product Director · Computer Project Manager · Cyber IT Knowledge Manager · Cybersecurity Scrum Master · E-Business Project Manager
This score estimates how exposed the tasks in a role are to current and near-term AI capabilities. It does not predict whether a specific person will lose a job.
Your free role snapshot
Start with the work, not the headline
This occupation baseline already contains different kinds of work. These are the two ends of its current task range and one useful action you can take now.
Most exposed task
Prepare project status reports by collecting, analyzing, and summarizing information and trends.
Augmentable 65/100 exposure
Most durable task
Coordinate recruitment or selection of project personnel.
Durable 30/100 exposure
Useful next step
Make one change to the task mix
Compare one real week with the exposed tasks, test one supervised delegation, and redirect the saved time toward more durable work.
Want this mapped to your actual week? Know what to strengthen, what to delegate to AI with review, and what to do over the next 7, 30, and 90 days.
Build my 7/30/90-day action plan — $9Most exposed tasks
No task is classified fully automatable in this release. The highest-exposure task relative to this role is shown in the free snapshot above; the assistive work is detailed next.
Augmentable tasks
Work where AI assists rather than replaces — the productivity frontier of this role.
-
Prepare project status reports by collecting, analyzing, and summarizing information and trends.65
-
Monitor or track project milestones and deliverables.60
-
Develop implementation plans that include analyses such as cost-benefit or return on investment (ROI).55
Most durable tasks
Lowest exposure — typically judgment, relationships, physical presence, or accountability. This is the human moat.
-
Confer with project personnel to identify and resolve problems.30
-
Direct or coordinate activities of project personnel.30
-
Monitor the performance of project team members, providing and documenting performance feedback.30
Task exposure values and classifications are published, versioned estimates audited against the anchored rubric. This page reads them from the data release rather than generating them at request time. Bars show exposure contribution relative to this role’s task mix.
What this means
A score of 44 puts Information Technology Project Managers in the most-exposed quarter of analyzed occupations. In practice, exposure this high is about the mix: 0 of 20 analyzed tasks lean automatable, 14 augmentable, and 6 durable. The useful question isn’t “will AI take this job” — it’s which tasks go first, which get faster, and where to reposition time. That’s what the personalized report maps against your actual week.
Lower-exposure adjacent roles
No adjacent role in the current data release is at least 10 points lower with ≥50% skill overlap — we don’t label anything “safer” unless the data supports it.
Labor-market context
- $116,580median wage
- 435,370employed
- 31,300annual openings
- +8.2%projected growth
Context only — labor statistics are not inputs to the exposure score. See methodology.
Turn your actual week into a plan
Know which work to strengthen, what to delegate to AI with review, and what to do over the next 7, 30, and 90 days. Your $9 plan includes a confidence-rated personal score, task matrix, human moat, and only genuinely lower-exposure adjacent roles.
Build my 7/30/90-day action plan — $9Related roles
Adjacent by skills or family — no exposure claim implied.
How this score was calculated
The score is the plain average of the AI-exposure values of this role’s 20 analyzed tasks (equal task weights in this release — no hidden factors):
- Augmentable 14 tasks, averaging 50/100 exposure
- Durable 6 tasks, averaging 32/100 exposure
score = (14×50 + 6×32) ÷ 20 ≈ 44
Every task’s exposure value was scored against a published anchored rubric that scores tasks as actually performed — physical, in-person, and accountability requirements included (data release 2026.07.12-r2). The band (Very High) is a corpus quartile; the percentile is tie-aware across all 968 occupations.
FAQ — Information Technology Project Managers
- Will AI replace Information Technology Project Managers?
- This score cannot predict whether this occupation or any individual job will be replaced. It shows which tasks current and near-term AI can perform or accelerate, which tasks remain more durable, and where a worker can adapt. Employer decisions, demand, regulation, and how the role changes are outside the score.
- What does a score of 44 mean for a Information Technology Project Managers?
- It means that, weighted across the 20 tasks we analyzed for this role, the task mix sits at 44 on a 0–100 exposure scale — in the most-exposed quarter of analyzed occupations. It measures task exposure to current and near-term AI capabilities, not the probability of losing a job.
- Which tasks in this role are most exposed to AI?
- This role has no strongly automatable task in the current data release.
- Which parts of this job are most durable?
- The most durable responsibilities are: Confer with project personnel to identify and resolve problems; Direct or coordinate activities of project personnel; Monitor the performance of project team members, providing and documenting performance feedback. Durable tasks typically depend on judgment, relationships, physical presence, or accountability.
- Is this score personalized to me?
- No — this page shows the occupation-level baseline. Two people with the same title often do different work. The $9 personalized report recalculates the score from the tasks you actually do and builds a concrete 7/30/90-day plan around them.
Score version jr-v1 · data release 2026.07.12-r2 · updated 2026-07-13 · baseline mapping: 20 of 20 tasks carry source-level provenance · methodology